Client: Ceylon Electricity Board (CEB)
Scope of work: Polpitiya-Hambantota 220kV, double circuit, three phase transmission line with one Optical Fiber Ground Wire (OPGW) & one Galvanized Steel Wire (GSW), approximately 150km long, including 484 towers. It is the first and longest 220kV transmission line in Sri Lanka that exclusively uses Chinese products.
N.i.u Group is able to provide an overall solution that includes OPGW, conductors, hardware fittings, and some other accessories for power projects.
For more detailed information, please contact us at sales@niuelec.com
26 Aug