Jordan: 132/33kV substation project

Project owner: Jordan National Power Company

Work content: 33kV substation outdoor equipment and control protection, AC and DC system, 33kV switch cabinet and capacitor bank supply and installation.


N.i.u Group is able to provide an overall solution that includes OPGW, conductors, hardware fittings, and some other accessories for power projects.

For more detailed information, please contact us at sales@niuelec.com

Main products of the group are more than 20series which include Cable connector, Brace clamp, Dead-end anchor clamp, Anchoring Branch clamp, Anchor clamp bracket, Parallel Groove clamp, stainless Steel band and buckles and so on.