Congo (Rep.):Construction of Supporting Power Transmission Project for Liouesso Hydropower Station in Congo (Rep.)
Client: Délégation Générale Aux Grands Travaux (DGGT)
Scope of work: Construction of 74.1km 110kV Liouesso-Ouesso transmission line, 12.85km 30kV Ouesso-Mokeko tranmission line, 71.29km 30kV Owando-Makoua transmission line, 2*10MVA 110/30kV S/S, 2*5MVA 30/20kV S/S, 2*2.5MVA 30/20kV S/S, and construction of 0.4kV line and public lighting.
N.i.u Group is able to provide an overall solution that includes OPGW, conductors, hardware fittings, and some other accessories for power projects.